Pre-drill cable holes (typically 200 mm x 200 mm) in the walls for routing power cables between the machine and control rooms. 2. Mechanical Assembly
: This is normal during the first installation. It indicates that mA calibration has not yet been performed. E13 (KV INEQUALITY) drgem x ray service manual install
The assembly process follows a sequential flow to ensure mechanical stability: Pre-drill cable holes (typically 200 mm x 200
Connect the display console to the generator's main cabinet. PC & DR Interface: Connect the PC Interface Module and the Digital Radiography (DR) I/O terminal blocks to the generator. 3. Software Installation & SDK Setup drgem x ray service manual install