Pwd Dsr 2015-16 Maharashtra Direct
| Section | Contents | |---------|----------| | | General rules, measurement guidelines, lead/lift policy, water charges, T&P (tools & plants). | | Part 2 | District-wise Basic Rates: Cement, steel, bricks, aggregates, sand, etc. | | Part 3 | Item rates (Earthwork – Excavation, filling) | | Part 4 | Concrete (Plain/RCC), formwork, reinforcement | | Part 5 | Masonry (Stone, Brick), Plaster, Pointing | | Part 6 | Flooring, Roofing, Woodwork, Painting | | Part 7 | Sanitary, Water supply, Drainage | | Part 8 | Road work (WBM, Bitumen, Seal coat, Tack coat) | | Part 9 | Bridge work, Steel fabrication | | Appendices | Conversion tables, escalation formulae, standard notes |
The Maharashtra PWD allows for percentage increases to these base rates depending on project location or difficulty: 5% increase. Tribal Areas: 10% increase for building and bridge works. Hilly or Inaccessible Areas: 10% increase. Pwd Dsr 2015-16 Maharashtra
. It serves as the "bible" for contractors and engineers to estimate the cost of government infrastructure projects like roads, bridges, and buildings. The Story of the "Blue Book" | Section | Contents | |---------|----------| | |
For 2015-16, the PWD Maharashtra published this data to ensure transparency in tenders under the . Tribal Areas: 10% increase for building and bridge works